Work to construct ₹65.98 crore ROB near Ambur commences
2026-03-10 - 18:33
Funded under the Tamil Nadu Deposit Fund 2025-26, the two-lane bridge will be 600 metres long and 7.5 metres wide with at least 50 LED streetlights on the bridge and its service lanes
Share this post: