Rejuvenation work apace at Thiruneermalai Periya Eri
2026-02-04 - 23:15
Desilting and bund strengthening at the lake raise hope of improved groundwater recharge and flood mitigation. MLA says additional amenities such as a walking path would be provided
Share this post: