Cauvery V Stage achieves over 50% coverage, easing summer drinking water availability in Bengaluru
2026-02-10 - 11:35
Cauvery V Stage, commissioned in October 2024, has achieved over 50% coverage with over 1.75 lakh connections using 400 MLD of water, as against an allocated 775 MLD for a target of over 3 lakh connections
Share this post: